Hut 8

Capacity landlordMiner pivotNASDAQ:HUT

Hut 8 is a capacity landlord that began as a bitcoin miner based in Miami, United States, founded in 2017. It is publicly listed (NASDAQ:HUT).

Record checked 10 Nov 2026hut8.comReport an error

Capacity, contracted949 MWas disclosed
Capacity, operating—not disclosed
Market cap$6.84Bmarket cap, 9 Nov 2026
Compute deals on record7$26.6B confirmed contract value

Key facts

ClassificationCapacity landlord, miner pivotHow types are assigned
StatusListed, NASDAQ:HUT
HeadquartersMiami, United States
Founded2017
Capacity and backlogHut 8 reported about $26.6 billion of aggregate base-term contract value (Q3 2026 results): two 352 MW IT leases at Beacon Point, Texas, to a highly rated investment-grade tenant (about $19.6 billion combined) and a 245 MW, 15-year lease at River Bend, Louisiana, to Fluidstack (about $7.0 billion, backstopped by Google), with the first River Bend hall due in Q2 2027. Utility capacity under construction rose to 1,330 MW (330 MW at River Bend and 1,000 MW at Beacon Point) after the Beacon Point Phase 2 lease, and Hut 8 agreed to acquire two energized West Texas sites with up to 230 MW of utility capacity, subject to final power approvals (Q3 2026 results).
Named customersFluidstack, Anthropic (partnership), Google (backstop)
Latest financing$1.07B, senior secured revolving credit facility, 2026
Investors namedJ.P. Morgan (bookrunner), Goldman Sachs (bookrunner)
Debt and financingHut 8 project subsidiaries issued $3.25 billion of 6.192% senior secured notes due 2042 for River Bend (April 2026) and $4.25 billion of 6.129% senior secured notes due 2042 for Beacon Point, rated Baa2 (closed 9 June 2026); Hut 8 also has a $1.07 billion four-year revolving facility, undrawn at Q3 2026.
Websitehut8.com
Profiles and workX @Hut8CorpLinkedInHow links are checked, checked 10 Nov 2026
Sources for this table: sec.gov, sec.govchecked 10 Nov 2026

Compute deals and financings

DateCounterpartyRoleTypeValueCapacityStatusSource · checked
20 Jul 2026Undisclosed (Beacon Point Phase 1 tenant)ProviderColocation lease$9.8B352 MWConfirmed
sec.gov$9.8 billion over a 15-year base lease termchecked 9 Nov 2026
4 Jun 2026Investment-grade bond investors (144A private offering)BuyerDebt financing$4.25B352 MWConfirmed
sec.govThe Notes will bear interest at a rate of 6.129% per annumchecked 9 Nov 2026
6 May 2026Undisclosed high-investment-grade tenant (Beacon Point Phase 1)ProviderColocation lease$9.8B352 MWConfirmed
sec.govrepresenting $9.8 billion in base-term contract value on a triple-net, take-or-pay basischecked 9 Nov 2026
30 Apr 2026Investment-grade bond investors (144A private offering)BuyerDebt financing$3.25B245 MWConfirmed
sec.gov6.192% Senior Secured Notes due 2042checked 9 Nov 2026
17 Dec 2025AnthropicProviderColocation leaseundisclosed245 MWConfirmed
canada.hut8.comat least 245 megawatts (MW) and up to 2,295 MW of AI data center infrastructurechecked 9 Nov 2026
17 Dec 2025FluidstackProviderColocation lease$7B245 MWConfirmed
sec.govTotal contract value of $7.0 billion over a 15-year base lease termchecked 9 Nov 2026
17 Dec 2025Google CloudBuyerBackstopundisclosed245 MWConfirmed
sec.govGoogle providing a financial backstop covering obligations for the 15-year base lease termchecked 9 Nov 2026

Latest posts on X

The most recent posts from @Hut8Corp, the X account of Hut 8, quoted as posted. Replies and reposts are left out. How posts are selected.

Today, we announced our results for Q3 2026. In the third quarter, we executed our power-first strategy at greater scale, broadening our origination program, fully commercializing our Beacon Point AI data center campus, and expanding our funding capacity. We advanced 1,300 MW of energy capacity to exclusivity and entered into agreements to acquire two energized sites in West Texas. At Beacon Point, our existing high-investment-grade tenant doubled its contracted capacity through a second 352 MW IT lease. In the credit markets, we closed a $1.07 billion senior secured revolving credit…
Read the full post on X · With 1 image
“We have always believed that great companies are built in person,” says CEO @ashergenoot. @SFBJNews covers our new Miami headquarters, with interiors designed by @gensler_design. The expanded space brings our teams together to deliver the next generation of energy and digital infrastructure. Read more: hut8.com/news-insights/in-the-News/a-new-…
View the post on X · With 1 image
Hut 8 welcomed @axios reporter @cabrasted to its First Look event at the River Bend data center campus, now under construction in Louisiana. From the substation and switchyard to the trestle system that will carry 762,000 linear feet of cable, Brasted traces the path that power will take from grid to data hall. Her reporting offers a rare look at the engineering and construction behind the AI buildout. Read more: axios.com/local/new-orleans/2026/10/07/da…
View the post on X · With 1 image
checked 10 Nov 2026

Is Hut 8 publicly traded?

Yes. Hut 8 is listed as NASDAQ:HUT. Its market capitalisation was $6.84B on 9 Nov 2026. Company filings are the primary source for its capacity, backlog and debt figures.

EveryNeo is an independent informational project. Nothing here is investment, legal or financial advice. Disclaimer

Other capacity landlords on the ledger

CompanyStatusContractedOperatingValuation / market cap
RRiot PlatformsNASDAQ:RIOT1.15 GW—$6.63B
TTeraWulfNASDAQ:WULF839 MW102 MW$6.18B
GGalaxy DigitalNASDAQ:GLXY526 MW133 MW$5.67B
AApplied DigitalNASDAQ:APLD1.41 GW250 MW$5.06B
CCore ScientificNASDAQ:CORZ1.1 GW485 MW$4.1B

Work at Hut 8, or see something wrong? Update this profile with a public source. How corrections work.